Chenlong does not publish a fixed price for cold roll forming equipment because each line is quoted from your profile drawings, material, dimensions, speed, punching and automation level. What is published: a 30% deposit on order, T/T or L/C payment, balance after inspection before shipment, and 20–30 or 40–60 business-day lead times.
Why won’t a manufacturer just give me a price?
Because a cold roll forming line is rarely one machine. It is a chain that can include an uncoiler, leveler, servo feeder, punching press, the roll forming mill, cutting, bending, welding and a stacker or palletizer. Chenlong builds lines from these modules around a customer’s profile, so two lines both called a “roll forming machine” can differ in almost every module.
A price quoted before the profile is known is either a placeholder or a price for a different machine than the one you need.
What exactly sets the quote?
Chenlong lists seven inputs that determine the project quotation:
Of these, scope (item 7) causes the largest gaps between quotes from different suppliers. One supplier quotes the forming mill alone; another quotes the full line from coil to bundle. Both may be honest, and the prices will still not be comparable.

I’ve seen USD price bands online. Why doesn’t Chenlong publish one?
The price bands found in online guides differ widely from one guide to the next, and they rarely state what line configuration, material or speed they assume. A band that wide tells you little you can budget against. Chenlong’s position is to quote against your drawings rather than publish a figure that may not match your project.
The trade-off is real: without a published band, you cannot budget before you contact the supplier. The fastest way around that is a complete RFQ (see the checklist further down), which lets a quotation come back on the first round instead of the third.
This is the data section of the article. Everything in these tables is published by Chenlong; nothing is estimated.
Commercial terms (Service page, company-wide)
| Termo | Valor divulgado | What it means in practice |
| Formas de pagamento | T/T, L/C | L/C shifts some payment risk to banks; T/T is simpler but relies more on supplier trust |
| Entrada | 30% na confirmação do pedido | Production starts against this payment |
| Equilíbrio | 70%, after inspection and before shipment | You pay in full before the equipment leaves the factory |
| Prazo de entrega de equipamentos padrão | 20–30 dias úteis | Roughly 4–6 working weeks |
| Prazo de entrega de equipamentos personalizados | 40–60 dias úteis | Roughly 8–12 working weeks |
| Produção acelerada | Pode estar disponível para pedidos urgentes | Must be agreed case by case |
The week figures are simple conversions at five business days per week. Ask whether the quoted lead time covers testing and packing, and add ocean freight and customs separately.
Published parameter ranges by production line
Chenlong publishes parameter ranges for some lines and not others. Each row below belongs only to the line named; one line’s figures do not carry over to another.
| Production line | Width | Thickness | Capacity | Other published data |
| Fire & electrical cabinet line | 10–2,000 mm | 0.2–10 mm | 0–50 m/min | Materials: SPCC, SPHC, SGCC, SUS, aluminum, SECC; servo feeder Yaskawa, Delta or customized |
| Cable tray line | 10–2,000 mm | 0.2–10 mm | 0–50 m/min | Same material list; servo feeder Yaskawa, Delta or customized; inline punching |
| Warehouse & supermarket shelving line | 10–2,000 mm | 0.2–10 mm | 0–50 m/min | Motor 3–200 kW; voltage 110–380 V customized to local supply; punching dies Cr12MoV, SKD11 or DC53 |
| C/Z purlin line | Not published | Not published | Not published | Application data only |
| Light steel keel line | Not published | Not published | Not published | Material types listed |
| Roof & wall panel line | Not published | Not published | Not published | Sandwich cores: EPS, PU, rock wool |
| Door & window frame line | Not published | Not published | Not published | Application data only |
Why this matters for price: the published ranges describe what Chenlong can configure, not one machine’s capability. A line built for 0.5 mm galvanized shelving panels and one built for heavy sections near the 10 mm end of the range share a catalog row but not a price. Thickness, width and speed all push up roll stand count, shaft size, drive power and punching tonnage.

What’s the most common mistake when comparing roll forming quotes?
Comparing totals before comparing scope. Lay quotes side by side, module by module:
| Module | Quote A | Quote B | Quote C |
| Uncoiler (manual/hydraulic, capacity) | |||
| Leveler / straightener | |||
| Servo feeder (brand) | |||
| Punching (press type, die material) | |||
| Roll forming mill (stations, shaft size) | |||
| Cutting (hydraulic/CNC, flying or stop-to-cut) | |||
| Stacking / palletizing | |||
| Control system and software | |||
| Spare parts and wear tooling | |||
| Commissioning and training |
Blank cells are the conversation. A low quote with four blank rows is often not a low quote.
Should I buy the line, or buy the profiles instead?
Compared with suppliers that only sell machinery, Chenlong also supplies finished cold-formed profiles, so this is a fair question to ask during quotation. Buying profiles avoids the deposit, factory space, operators and maintenance. Owning the line makes sense once your volume, delivery-time needs or profile confidentiality justify the investment. Neither answer is universal; ask for both options against the same drawing.
Does a CNC-controlled line always cost more?
Generally a higher automation level raises the price, since automation level is one of the seven quotation inputs. The edge case is labor: if your market has high labor cost or you change profile sizes often, a more automated configuration may cost less over its working life. That calculation depends on your wages and order mix, so no supplier can honestly give you a payback period without your numbers.
Is a 30% deposit with balance before shipment normal?
It is a common structure for custom industrial machinery from China. The risk to understand: the full price is paid before the equipment ships. Two ways to manage it:
1.Use the inspection step. The balance falls due after inspection. Ask in writing who may attend (you, an agent, or a third-party inspector), which of your profiles will be run, and what acceptance criteria apply.
2.Consider L/C. Chenlong accepts letters of credit, which tie payment to shipping documents through banks.
What certifications should I ask about before paying?
Da Chenlong Sobre Nós page states ISO9001, CE and SGS approvals at company level. Certificate numbers, issuing bodies, validity dates, scope and CE Declaration of Conformity details are not published, so request them before order confirmation.
For context, ISO describes ISO 9001:2015 as a quality-management-system standard covering how a company establishes, maintains and improves its QMS. It certifies the management system, not a particular machine’s performance. Machinery safety design falls under a different framework, such as ISO 12100:2010 on risk assessment and risk reduction.
Items 6 and 8 are the two most often left out, and they are the two that most often change the price later.
Q: Is there a roll forming machine price list?
A: Chenlong does not publish a price list. Every line is quoted per project from the inputs listed above.
Q: Is cold roll forming equipment available for sale as standard machines?
A: Chenlong offers both standard equipment (20–30 business-day lead time) and custom equipment (40–60 business days). Which category your line falls into depends on your profile and configuration.
Q: What is the best cold roll forming equipment?
A: There is no single best line. The right equipment is the one whose width, thickness, speed, punching and automation match your profile and volume. Judge suppliers on how completely their quotation answers your RFQ.
Q: What payment terms does Chenlong accept?
A: T/T and L/C, with 30% down payment on order confirmation and the balance after inspection, before shipment.
Q: Can production be expedited?
A: Chenlong states that expedited production may be available for urgent orders. Confirm feasibility and any cost difference at quotation stage.
Q: What after-sales support is included?
A: Chenlong offers 24/7 technical support positioning with remote diagnostics, video consultation, spare-parts supply and optional on-site service. The China headquarters is the only company location identified, so price on-site commissioning separately if you need it.
A temporary power distribution box is a portable enclosure that takes one incoming supply …
Seven electrical panel board types explained for cabinet and switchgear manufacturers, plu…
Responderemos dentro de 24 horas. Para casos urgentes, adicione WhatsApp/WeChat: +8613863639320. Ou ligue diretamente para +8613863639320.
*Respeitamos sua confidencialidade e todas as informações estão protegidas.
Usaremos suas informações apenas para responder à sua consulta e nunca enviaremos e-mails não solicitados ou mensagens promocionais.